Abstract

Semiconductor wafer fab is considered as the third kind of production system, differentiated with job shop and flow shop. It has its own scheduling and control characteristics, such as re-entrance, large-scale, mix processing model and unbalanced production facilities. To solve scheduling problem of semiconductor wafer fab, an agent-based scheduling approach for semiconductor wafer fab is proposed. Firstly, an agent-based scheduling model, which integrates release control, dispatching and machine maintenance scheduling, is presented. Secondly, negotiation protocol between agents, extended contract net protocol (ECNP), is given. Thirdly, scheduling algorithms for decision making of agents are offered. Finally, a simple model, but with essential characters of semiconductor wafer fabrication, is used to demonstrate how to use the proposed agent-based scheduling approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.