Abstract

When simulating individuals’ daily plan, lots of unexpected events need to be considered, like traffic jam and weather changes. Therefore, there will be a mismatch between the original plan and the executed one. Faced with this situation, individuals need to adjust the rest of the activities to make a new schedule. This paper analyzes the causes of rescheduling, and establishes a new rescheduling model, combining strengths of existing rescheduling models. The model in this paper considers the rescheduling possibilities and choices as much as possible. It takes time pressure and schedule similarity into consideration when updating a schedule. Furthermore, this paper analyzes joint trip/activity execution by studying the cooperation between agents during the rescheduling process.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.