Abstract

Due to the complexity of optimum replacement problems over finite lime horizons various asymptotic criteria based upon fixed age replacement policies have been employed in the literature and in practice. In this paper the relationships between the optimum policies under three alternative cost criteria are considered. An ordering of the accounting costs under two of these is obtained, and for distributions with Increasing Hazard Rate an ordering of the optimum replacement time is derived. For a finite time horizon the policies are compared to the optimal sequential and fixed-age replacement polices through the example of a gamma distribution previously investigated by Barlow and Proschan (Barlow, R. E., F. Proschan. 1962. Planned replacement. K. J. Arrow, S. Karlin, W. L. Smith, eds. Studies in Applied Probability and Management Science. Stanford University Press, Stanford, Cal.; Barlow, R. E., F. Proschan. 1965. Mathematical Theory of Reliability. Wiley, New York.).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.