Abstract
This paper proposes two modified replacement policies which combine random replacement with standard age and periodic policies, where units undergo replacement at the first completion of some random working time over a planned time T, which are called replacement overtime. The expected cost rates of age and periodic replacement overtime polices are obtained, and optimal policies which minimize them are discussed analytically. Comparisons between such two overtime policies and standard age and periodic replacements are made in detail. When two costs for replacement overtime and standard age or periodic policies are the same, it is shown as estimated previously that the standard replacements are better than their overtime policies. Furthermore, two modified replacement overtime costs are discussed and computed numerically when such new policies would be better than the standard age and periodic replacements.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Reliability, Quality and Safety Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.