Abstract

Abstract This paper describes the subsea facilities designed and built for the AGBAMI field development as defined by the Subsea Equipment Vendor (SEV) contract issued to FMC Technologies by Star Deep Water Petroleum Limited - an affiliate of the Chevron Corporation in partnership with Texaco Nigeria Outer Shelf Inc, Petroleo Brasileiro Nigeria Limited, Statoil Nigeria Limited, Famfa Oil Limited and the Nigerian National Petroleum Corp. The history of the design, manufacturing, testing and project logistics are described along with useful lessons learned. The Agbami field is located offshore from the central Niger Delta in water depths ranging from 4,200 to 5,400 feet of water, graphically illustrated in Figures 1 & 2. The physical size of the field can be visualized as fitting tightly within interstate (Loop) 610 which girdles the city of Houston as illustrated in figure 3. The field is being developed using 100% subsea completions tied-back to an FPSO and tanker mooring system. The subsea completion system includes 16 production trees, 6 Gas Injection Trees, 10 Water Injection Trees which will be tied back to 6 production manifolds, 2 gas injection manifolds and 4 water injection manifolds. The SEV contract covers this equipment as well as all flowline and jumper connector kits, electrical flying leads (EFL's) and Hydraulic (Steel) Flying Leads (SFL's), topsides Multiplex (MUX) controls system and installation tooling. The remainder of the subsea kit was supplied by the Subsea Installation Contractor, Technip, including the umbilicals, flexible flowlines, risers, flexible jumpers and subsea umbilical terminations. Project success was dependent upon more than simple hardware delivery and installation. Included with the contract hardware deliverables were extensive requirements for documentation management, interface management, Nigerian manufacturing and engineering content, technology transfer for sustainable long term development in Nigeria and facilities logistics as well as field and technical personnel support in a location which has limited support facilities for offshore field developments and well as security challenges which had to be managed successfully.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call