Abstract
The paper describes the evolution of a successful new combined cycle utility generation plant over nearly two decades in response to external and internal requirements for commercial, environmental and functional performance. The Afton Project followed an evolutionary path from initial development as a peaking unit into its full realization as an innovative combined cycle station utilizing a hybrid cooling system to realize its owner’s objectives for water conservation and the ability to respond to load demands in the arid Southwest. Afton, a state-of-the-art 225 MW combined cycle facility, entered commercial operation in October of 2007, delivering critically needed capacity with NOx at 3.5 ppm or less.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.