Abstract

Abstract Aki-nada Ohashi Bridge (tentative name) is now under construction with 750 m in center span length, 1175 m in total bridge length. The girder of the bridge is 19 m in width with two-lanes and pedestrian space, and the configuration is flat hexagonal box shaped. This paper describes the aerodynamic stability of both the completed stage and erection stage of the girder. Its improvement is also described.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.