Abstract
AbstractThis How‐To paper is for those persons newer to the global perspective of systems engineering. It describes adapting the formal software change control process of DOD‐STD‐2167A for use in improving a deficient hardware process as part of increasing its maturity of capability. After minor procedures and forms revision, while using identical computer support and physical paper handling to that of Software Problem Report processing, Requirements Management was improved. The experiment resulted in “earlier” correct specification of system design requirements, interface requirements, and design verification requirements for hardware configuration items.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.