Abstract

Treatment performance and operational parameters of a pre-coagulation and biofilm process were experimentally discussed with the pilot-scale plant treating actual municipal sewage. Perfect nitrification was accomplished within total hydraulic retention time (HRT) of 4 h at 20% volumetric added ratio of attached-growth media of biofilm in the aerobic tanks under temperature conditions as low as 17 degrees C. Treatment efficiencies in organic matter, T-N and T-P were high and stable with the total HRT of 8 h in the biological reactor. Concentrations of T-N and T-P in effluent were kept about 2 mgN/L and under 1 mgP/L, respectively. Attached growth bacterial mass and the potential activity of nitrification and denitrification in each tank in cold season were high enough to accomplish excellent treatment performance. Then the process was proved to be applicable to municipal sewage treatment for removal of nitrogen and phosphorus as well as organic matter.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.