Abstract
The problem encountered by military manufacturing enterprises in the preparation of production plans is mainly attributable to the failure to optimize supply and demand resources in the supply chain. The article innovatively employs the advanced planning system based on linear programming model to solve the problem. The problem is first of all described mathematically; then its linear programming model is constructed, and the latter’s APS system designed; at last, the model is solved and checked. Upon the verification, the model is proven helpful for enterprises to work out production plans quickly and efficiently, and carry out what-if analysis. While winning the time advantage for military manufacturing enterprises in the market competition, it also enhances their operating management efficiency.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have