Abstract

In this paper we discuss a real-life case study in the optimization of the logistics network for the collection of containers from end-of-life vehicle dismantlers in the Netherlands.Advanced planning concepts like dynamic assignment of dismantlers to logistic service providers are analyzed by a simulation model.In this model, we periodically solve a vehicle routing problem to gain insight in the long-term performance of the system.The vehicle routing problem considered is a multi depot pickup and delivery problem with alternative delivery locations.We solve this problem with a heuristic based on route generation and set partitioning.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.