Abstract

Background: Planning and scheduling of manufacturing enterprises are required to be rapid and accurate, which make is easy for the traditional enterprise resource planning system to meet the needs of enterprises. Objective: This paper introduces the theory of constraints and explains the control methods for production planning and scheduling. Methods: The main characteristics of the advanced planning and scheduling system are analyzed. Then, the modeling method based on the theory of constraints is used to study the scheduling path. Results: An example is given to validate the scheduling model and realize the optimization of production tasks on the bottleneck resources. Conclusion: The feasibility of the advanced planning and scheduling methods based on the theory of constraints is proved.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call