Abstract
With the increased load demand and generation cost of electricity, renewable energy sources (RES) provide cost effective and environment-friendly solution. Integration of solar energy includes the challenges of finding the Maximum Power Point (MPP) to achieve the maximum power from the solar. Combining RESs with distributed generation (DG) comes with the challenges of voltage regulation and frequency mismatch. In this work, a novel approach of Robust Antlion Optimizer (ALO) algorithm is implemented for MPP tracking in solar photovoltaic (PV) system and charge controllers are designed for storage system while the DC to AC converters have been designed to match RESs’ frequency with that of DG. Power scheduling is done to decrease operational cost while keeping the voltage and frequency in the allowable range. Research findings provide useful policy implications for all stakeholders to meet energy needs in a consistent and coherent manner.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.