Abstract

Presents the results of a pilot project on implementation of just‐in‐time (JIT) production for an automotive component (sleeve for synchronizing groups). Describes the old manufacturing system and outlines the related problems. Proposes, with the aim of reducing set‐up times and increasing flexibility, quality and logistic performances, a new advanced manufacturing system using JIT as an approach. Presents a summary of costs and benefits arising from the new system, outlining factors such as a total cost of $3 million and a lead time reduction of 60 days.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.