Abstract

AbstractThe design of three mined stations in Toronto as part of the Eglinton Crosstown Light Rail Project involved several intersections of large tunnels situated in the heterogenous, water‐bearing glacial till deposits. The most challenging openings, 220 m2 each, were formed in the two sides of the 18 m high cross‐cut tunnels to allow the excavation of the 18 m wide platform caverns. A key objective for the design was the optimization of the tunnel shapes and the advanced simulation of the fibre reinforced shotcrete properties, to allow these openings in the initial tunnel linings to be achieved without conventional bar reinforcement or thickenings, thus simplifying and accelerating the construction, whilst reducing health and safety risks.Advanced numerical analyses were utilized to simulate the staged excavation and support steps introducing advanced material models that accounted for the non‐linear behaviour of both soil and structural elements. The end product was an optimized design of the tunnel linings with synthetic fibre reinforced shotcrete without conventional reinforcement that was successfully implemented in the construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.