Abstract

Advance grouting is an important approach to reinforce the rock mass ahead of the tunnel face in TBM tunneling. To estimate the grouting result in TBM tunneling, a test method based on seismic ahead prospecting method was proposed. To check the grouting result, the seismic ahead prospecting was applied firstly to obtain the distribution and location of adverse geologies for grouting; Then, the geological conditions was estimated again after grouting; By studying the characteristics of reflections and velocity distributions, the grouting result could be checked. Numerical simulations prove the availability: Wave field snapshots indicate the energy of reflected waves reduces after grouting; Migration results indicate that the reflections reduce or disappear after advance grouting, as well as the estimated velocity increases. Moreover, the method was successfully applied in the diversion tunnel of the water supply project from Songhua River, which reveals the grouting result well and provides important geological guidance for construction.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.