Abstract

During decades of work on the development and improvement of engines intended for combat and non-combat vehicles of the Serbian Armed Forces, original methods were developed for setting, testing and checking the functionality of various types of high-pressure in-line pumps that are installed on those engines. These activities are not performed continuously, yet are performed as required by the job, often with very lengthy breaks. Through current research, development and functional tasks or periodic technical assistance in the comprehension of overhaul and production, these activities are frequently handled by highly qualified and narrowly specialized research staff. The goal of this paper is to describe the developed methods and the acquired experiences in as much detail as possible and to standardize them in certain way, so that they are not forgotten, but could be permanently available to the research staff dealing with this issue.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.