Abstract

Some manufacturing firms, particularly in the high-technology sector, have production processes which are characterized by very low initial yields followed by steady “experience” based yield improvement. Material Requirements Planning literature reveals that MRP implementations are seldom adjusted in any systematic way to account for such yield improvement. A single product, single stage MRP model is developed which incorporates learning curve behavior into conventional MRP logic. A series of experiments systematically examine the impact on mean inventory level of various combinations of environmental conditions and managerial policies. The research demonstrates that substantial reductions in mean inventory levels can be realized in low yield environments if learning is properly included in the order release logic. This finding proves to be robust with respect to modest errors in the estimation of learning rate.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.