Abstract

Wicked problems are recognised and need to be seen as a subset of complex systems or projects. Complex projects are identified within a hierarchy of simple, complicated, and complex and then complex projects are separated into three distinctive types. Wicked problems (type B) are focused on and solution methods addressed. Methodologies to identify stakeholders and project boundaries are identified and it has been found that the use of soft system methodology, especially to create meaning, is valuable. Multiple perspectives are identified through use of Dooyeweerd's suite of aspects in which to frame the rich picture and consequently the root definition and solution.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.