Abstract

Summary A multiphase flowmeter was used in addition to conventional surface well-test equipment during five deep offshore exploration drillstem tests. Several immediate benefits were derived. The cleanup phase was monitored, which improved control of the formation drawdown as well as the prediction of well eruption. The flow history was better quantified, which improved the pressure-transient analysis. The instantaneous flow-rate measurements shortened flow periods and accelerated the decision process, reducing the overall test duration. In general, the multiphase flow-meter enhanced operation flexibility, confidence in the information acquired, and accuracy of the results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call