Abstract

The problem of whether, where, when, and what types of transmission facilities to build in terms of minimizing costs and maximizing net economic benefits has been a challenge for the power industry from the beginning-ever since Thomas Edison debated whether to create longer dc distribution lines (with their high losses) or build new power stations in expanding his urban markets. Today?s planning decisions are far more complex, as grids cover the continent and new transmission, generation, and demand-side technologies emerge.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.