Abstract

This paper presents a managerial project control scheme in which the time between the control points is not fixed but instead is a function of the distance between the planned and the current performance levels. Varying the reviewing interval improves the efficiency of the project monitoring and control process and allows project managers to obtain the required information more quickly. To evaluate the effectiveness of the proposed scheme, a systematic computational experiment is carried out. Besides, a practical case study is given to illustrate the applicability of the proposed scheme. The results reveal the satisfactory performance of the adaptive control scheme.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.