Abstract

In this paper we propose an adaptive model for multi-mode project scheduling under uncertainty. We assume that there is a due date for concluding the project and a tardiness penalty for failing to meet this due date, and that several distinct modes may be used to undertake each activity. We define scheduling policies based on a set of thresholds. The starting time of the activity is compared with those thresholds in order to define the execution mode. We propose a procedure, based on the electromagnetism heuristic, for choosing a scheduling policy. In computational tests, we conclude that the adaptive scheduling policy found by using the model and the heuristic solution procedure is consistently better than the optimal non-adaptive policy. When the different modes have very different characteristics and there is a reasonable difference between the average duration of the project and the due date, the cost advantage of the adaptive policy becomes very significant.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.