Abstract
This paper proposes a novel adaptive nesting Evolutionary Algorithm to jointly optimize two important aspects of the configuration and planning of a Microgrid (MG): the structure’s design and the way it is operated in time (specifically, the charging and discharging scheduling of the Energy Storage System, ESS, elements). For this purpose, a real MG scenario consisting of a wind and a photovoltaic generator, an ESS made up of one electrochemical battery, and residential and industrial loads is considered. Optimization is addressed by nesting a two-steps procedure [the first step optimizes the structure using an Evolutionary Algorithm (EA), and the second step optimizes the scheduling using another EA] following different adaptive approaches that determine the number of fitness function evaluations to perform in each EA. Finally, results obtained are compared to non-nesting 2-steps algorithm evolving following a classical scheme. Results obtained show a 3.5 % improvement with respect to the baseline scenario (the non-nesting 2-steps algorithm), or a 21 % improvement when the initial solution obtained with the Baseline Charge and Discharge Procedure is used as reference.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.