Abstract

A lagoon type tidal flat was constructed at the coast of Kuwait Bay to verify its water purification function, since tidal flats in Kuwait Bay seem to play important role on water quality improvement in the bay. Although recruitment of tidal flat organisms was expected to bring water purification function to the constructed tidal flat, unforeseen sludge accumulation degraded their habitat condition. To solve the issue, original design of the tidal flatelevation was modified based on the causal analysis. As a consequence, habitat condition was improved and the effectivenessof adaptive management process was proved. The observed water purification capacity of the constructed tidal flat wasmaximally corresponded to a waste water facility with a capacity of about 2, 000 people, although continuous monitoring survey was required.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.