Abstract
Different energy systems are generally planned and operated independently, which result in the low energy utilisation, weak self-healing ability and low system reliability. Therefore, an adaptive clustering-based hierarchical layout optimisation method is proposed for a large-scale integrated energy system, considering energy balance, transmission losses and construction costs. First, an adaptive clustering partition method based on energy balance and load moments is proposed to determine the optimal location of energy hubs and to allocate each distributed generation and load to different energy hubs, forming multiple regional integrated energy systems adaptively. Then, the proposed hierarchical layout optimisation model is formulated as to find the modified minimum spanning tree of the regional integrated energy system and multi-regional integrated energy systems, respectively, to construct an economical and reliable interconnection network. Finally, the effectiveness of the optimisation model and strategy is verified by simulations.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.