Abstract

The successive switching of the phases of lines with control of the induced voltage in the phases through three-phase automatic reclosure makes it possible to avoid switching on interphase short circuits, and in 2/3 of the cases of single phase faults, to avoid switching on short circuits in general. By using this method for testing aerial transmission lines it is also possible to avoid switching the three phases onto a short. Here it is unnecessary to make any significant changes in the functional protective circuits. The proposed method can be used on 330–750 kV aerial transmission lines, as well as on 110–220 kV aerial transmission lines that are equipped with phase controlled breakers and voltage transformers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.