Abstract
The article discusses some urgent problems that designers face when developing design documentation for overhaul or reconstruction of capital structural facilities using the example of the object “The pool overhaul at the address: Rostov-on-Don”.
Highlights
One of the main design goals is the development of a technical solution in accordance with the task
Significant defects and damage recorded during the survey - significant damage to the reinforcement by corrosion from 40 to 90% of the cross-sectional area
It should be noted that the protective layer of concrete in the walls is peeling off
Summary
One of the main design goals is the development of a technical solution in accordance with the task (technical design assignment). The implementation of the technical task can lead to both the overhaul of the structure and its reconstruction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.