Abstract

The purpose of this research is to calculate the price of basic production mixed asphalt with fuel shells palm oil and diesel fuel in blow dryer asphalt mixing plant. The research is quantitative descriptive that focuses on the subject of study by decomposing, analyzes, and collect data the subject of study by a process of interviews and data collection secondary to Asphalt Mixing Plant (AMP). The process of data analysis to determine prices basic production uses the activity based costing who reckoning based on activity his job. The result of this research is the price basic the production of mixed asphalt Rp 916.821,10 per 1000 kg mixed asphalt. While the difference between the price production basic mixed asphalt with fuel shell palm oil with diesel fuel is Rp 66.837,44 or the cost of goods production mixed asphalt with fuel palm shell 6, 8 % for cheaper production of mixed asphalt use diesel fuel.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.