Abstract
An activity represents a physical construction operation and can be easily identified. Modeling construction process by activities has been widely accepted in the construction industry. Activity is the sole modeling element in many traditional construction scheduling and planning methods such as in bar chart and critical path method (CPM). Activity-Based Construction (ABC) is a general-purpose modeling and simulation method developed in recent years by the author with activity as the only modeling element. This paper contrasts CPM technique with ABC modeling. Such comparison concludes that the ABC modeling philosophy is similar to CPM modeling, and the ABC simulation model appears also similar to the activity-on-node network diagram. However, an ABC model can be experimented in the developed ABC simulation system with the animation function to allow the user to visualize the dynamic construction progress on a computer screen.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.