Abstract

In water-cooled fusion reactors, the assessment of the primary system contamination is essential for waste management, machine availability, occupational radiation exposure, and radiological hazard determination. The primary cooling water is not only directly activated by the intense neutron field but is a contamination vector for a significant variety of gamma emitters with short to long decay half-lives. Corrosion products can be activated in those regions under neutron flux of the primary circuit and then released in the cooling water.In the EU-DEMO fusion power plant equipped with the Water-Cooled Lithium Lead Breeding Blanket (WCLL-BB) concept, the primary coolant undergoes intense neutron fields in the first wall and the breeding zone regions of the blanket. Activated Corrosion Products (ACPs) are then formed, released into the water, transported in the cooling loop and finally deposited onto the ex -vessel surfaces of the Primary Heat Transport System (PHTS), where working personnel are susceptible to being radiologically exposed.This work addresses the complete assessment of ACPs in the WCLL-BB PHTS of EU-DEMO. The simultaneous and multi-physical processes behind the ACP formation are tackled using the OSCAR-Fusion code, a comprehensive tool developed by the CEA (France) to assess contamination in fusion nuclear reactors. The whole system is modelled with zero-dimensional nodes with assigned geometrical, thermal-hydraulics, material and chemical parameters. Activation reaction rates integrated over the whole spectrum and calculated with MCNP are given to those regions exposed to the neutron flux. Results are provided in terms of mass and activity inventories of ACPs as deposit and inner oxide layers of components (pipes, heat exchangers, pumps...), ions in solution, particles in suspension, and filters and resins trapping.Mobilizable inventories such as ions, particles and deposits are important source terms in accidental scenario evolutions, while the whole activity inventory constitutes the main long-term gamma emitting source for dose rate maps determination in the tokamak building rooms housing the main PHTS equipment.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call