Abstract

We analyze factors due to which damage occurred in the first period of operation in the 12Kh18N1 austenitic-steel tube system of the delivery-water heater used as part of a T-180/210-130 turbine unit operating in a couple with a high-pressure drum boiler. Technical solutions undertaken for achieving reliable operation of the heater are considered.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call