PurposePreparation of preliminary estimate is difficult owing to the lack of full project details in the early phases of the construction project. This paper seeks to assess the estimation techniques used for road projects and the critical factors affecting their accuracy in the Ghanaian construction industry.Design/methodology/approachQuantitative research design was adopted and questionnaire was designed to retrieve data. The target population were engineers and quantity surveyors who were contacted using an e-questionnaire through their professional bodies owing to location constraints. Retrieved data were analysed using descriptive and exploratory factor analysis. In order to compare the opinions of the respondents, the Mann–Whitney U-test was employed.FindingsThe survey revealed that subjective, parametric, comparative and analytical estimations are in use in Ghana. The most critical factors influencing the accuracy of estimation techniques are improper project planning, insufficient preliminary site investigation and usage of shortcuts, among others.Research limitations/implicationsThis study was limited to Accra, Ghana, due to time and distance constraint.Practical implicationsFor accuracy of preliminary estimates to be improved, estimators being the custodian of the estimate are expected to be devoid of errors such as arithmetic calculation errors, inaccurate quantity measurement and error of omission. The usage of estimating software can eliminate these human errors.Originality/valueThe study will assist policymakers and stakeholders in aligning mitigative actions for factors influencing preliminary estimate of road projects with defined clusters rather than basic ranks. With attention focussed on the characteristics of each cluster, accuracy of preliminary estimate can be improved.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call