Abstract
AbstractThe traditional optimization approach for water distribution mains is that of considering a single design scenario with prefixed nodal demands representing the peak values at the end of the life cycle of the construction. Instead, this paper presents a different approach for the design of water distribution mains aimed at considering the phasing of construction. It makes it possible to identify, on prefixed time steps or intervals (for instance 25 years), the upgrade of the construction rendering the network able to satisfy, during the expected life of the system, growing nodal demands related to the increment in the population served. To show the benefits of this approach in comparison to using a single design flow, an optimization methodology, aimed at introducing new pipes in the network as needed at each time step, was set up and applied to a simple case study, where two different scenarios were considered concerning the growth of the network. Results showed that this approach is able to yield...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Water Resources Planning and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.