Abstract

In this paper, the factors are analyzed,which affect the accommodation capacity of large scale PV power generation access to the grid . The analysis method mainly consider the peak load adjustment ability of the whole power system. Then a real case based on provincial grid is calculated and analyzed. The results show that: As an important technical style ,the generation and acommodation of the large scale photovoltaic power generation are influenced by the light resource, load level, adjustment ability, transmission channel. The planning of large-scale photovoltaic power plants must keep pace with the conventional power and grid planning.