Abstract
The recent change in the Tokamak Fusion Test Reactor (TFTR) program schedule has introduced a postponement of tritium operation for at least three years (currently scheduled for 1993). In the interim, TFTR research will place greater emphasis on understanding the physics of transport in tokamaks. This increased emphasis will result in the addition of more diagnostics and upgrades to existing diagnostics, significantly increasing the amount of data acquired for each TFTR experimental pulse. As the total data per shot increases, providing adequate facilities for acquiring, storing, analyzing, and archiving data will be a continual challenge. An overview of the functions of the TFTR central computing system is presented, and the areas which will need to be addressed to provide support for the larger data loads are identified. >
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.