Abstract

Communication-based train control (CBTC) systems are a new generation of metro signaling system dependent on wireless technology with appropriate access point (AP) deployment. Improved AP deployment can improve the reliability of wireless CBTC systems. This paper proposes a method for optimizing the AP deployment in the data communication system of CBTC. To validate the optimal AP deployment, an integrated simulation environment is used to test the performance of the optimized AP deployments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.