Abstract

In Ireland the construction sector is at the initial stages of assessing and adapting Building Information Management (BIM) on pilot projects. At an initial summary review BIM could be seen as a fad that will burn out as quickly as it appeared. Many of the concepts associated with BIM are grounded in Co-ordinated Project Information (CPI), Integrated Project Delivery (IPD) and object modelling which have been developed over the last 20-30 years. This research presents the critical success factors (CSF) associated with knowledge management (KM) and investigates the correlation of these with the development and integration of BIM within the construction industry in Ireland. These CSF will be addressed in the context of assessing maturity levels prior to integrating KM or BIM. Determining the CSF will accelerate the implementation of BIM. Developing a BIM CSF Analysis Model will assist in assessing a company’s readiness to embark on BIM projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.