Abstract

ACC Limited, under Project 30-30, had targeted to produce and sell 30 million tons (mt) of cement in the year 2011. In May 2011, the Head of Central Logistics had found the target of the project to have become increasingly difficult to achieve. He believed that to sell 30 mt of cement, 30 mt had to be transported, thereby, advancing the role of the logistics function from that of a mere facilitator to a critical actor. As possible opportunities to increase sales, issues at the Bulk Cement Corporation (India) Limited (BCCI), and the plant at Wadi are being discussed in the case. The head of BCCI had raised concerns about the decreased logistical capacity of BCCI post a mandate from the Indian Railways on transporting 58-wagon rakes against 41-wagon rakes. A common belief was that with more wagons per rake, the quantity transited from Wadi would be higher. However, this was not the case and a capacity addition was being proposed. The President of Wadi Cluster had expressed that as an effort to reduce the transit time between Wadi and BCCI, priority was given to loading for BCCI. Though an improvement was observed with the introduction of 58 wagons per rake, Wadi was facing issues. This had affected Wadi's ability to serve other markets. The focus of the case is on analysing the options being considered by ACC to increase market presence, logistics capacity at BCCI, and the overall throughput at Wadi.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.