Abstract

This study was made aiming to determine the optimal time needed in the implementation of the ABC project by using the CPM / PERT method, to determine the time needed in the implementation of the ABC project using the Crashing Project method and to find out the additional costs required in using the Crashing Project method. The analytical research method used is the CPM / PERT method and the Crashing Project. The results of this study show that the ABC project has a critical path that must be done, namely the A-B-C-D-E-H-I-J-K-M-N-O-R-S-T-U activity within 99 days. The cost calculated through Crashing Project is Rp. 219,300,000 and can save time to 83 days of project execution. Consumer demand to complete the project within 90 days. There fore the results of the Crashing Project get the amount of the cost of Rp. 6,200,000. The conclusion is the ABC project can be completed within 90 days using the CPM / PERT method and the Crashing Project (DJ, HKJ and S)

Highlights

  • Along with the development of technology, based on data from the Central Statistics Agency (BPS), the information and communication technology industry (ICT) in 2011-2015 grew from 9.98 to 10.7% per year

  • The high growth of ICTs in Indonesia is reflected in the large allocation of capital expenditure in the ICT sector which continues to rise every year

  • The International Data Corporation (IDC) research institute predicted that the capex of the ICT sector in Indonesia in 2016 will reach US $ 15.3 billion (Rp 201.76 trillion), growing 8.5% from last year's US $ 14.1 billion (Rp 183, 53 trillion) [1]

Read more

Summary

INTRODUCTION

Along with the development of technology, based on data from the Central Statistics Agency (BPS), the information and communication technology industry (ICT) in 2011-2015 grew from 9.98 to 10.7% per year. The competition that occurs in the world of information and communication technology (ICT) industries becomes more stringent and competitive when compared to past competition This situation causes competition in terms of cost, time, and quality of work offered by the company to win the work rights of a project. PT PAC Engineering which is engaged in the Automation contracting industry is expected to be able to manage and plan a project that they will work on carefully in order to achieve optimal results.The project to be investigated is the ABC project which runs from 6 March 2017 to 9 July 2017, because this project has a high complexity compared to other projects and researchers are given permission to evaluate the project from the company. The objectives that can be designed in this study are to find out the optimal time needed in ABC project implementation using CPM / PERT method, to find out the time needed in ABC project implementation by using the Crashing Project method, and to find out the additional costs needed in using the Crashing Project method

RESEARCH METHOD
Critical Path Method Analysis
Analysis of PERT method
Activity A
Crashing Project Results
Alternative Crashing Project
Implications of Research Results
Suggestion
Findings
CONCLUSION AND SUGGESTION