Abstract
We have studied three plans for re-use of the abandoned mine roadway tunnels as an energy center. These are the thermostat plan, the thermal accumulator plan, and the CAES plan. Calculations show that the thermostat plan can provide over 15,000 m 2 of building air-conditioning/heating load for each kilometer of roadway, but electric power is needed to run the system. Numerical research proved that the accumulation of hot water in the roadway for seasonal heating purposes (a temperature swing from 90 to 54 °C) is a viable possibility. The CAES plan proposes using the discarded coal mine tunnel as a peaking power station with an energy storage density over 7000 kJ/m 3. It can be concluded that presently abandoned coal mines could be reformed into future energy centers for a city.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.