Abstract
Since the oil crisis in 1973, IGCC R&D has significantly promoted in the worldwide. In 1984, the first commercial scale IGCC demonstration plant was operated at the Cool Water thermal power station in the United States. In Japan, the 200t/d IGCC Pilot Plant Project had started in 1986 with adoption of the air blown entrained flow type gasifier by the Engineering Research Association for Integrated Coal Gasification Combined Cycle Power Systems (IGC Association). Through the trouble shooting and modification of the gasifier, the Pilot Plant achieved 789 hours of continuous operation. Due to the knowledge and experience of early IGCC pioneers, the first Japanese IGCC Demonstration Plant is now under operation successfully. The Demonstration Project is being executed by Clean Coal Power R&D Co., Ltd. A long term continuous operating has already been achieved in 2008, and it is advanced well aiming at commercial plant.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: The Proceedings of the International Conference on Power Engineering (ICOPE)
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.