Abstract

This paper analyses a worst-case performance of the shortest-processing-time (SPT) heuristic in minimizing a quadratic function of job lateness for single machine scheduling. A sufficient condition on processing-plus-wait due dates is found for the SPT sequence to be optimal. A worst-case lower bound to the optimal solution is derived from the SPT sequence. It is then shown that the SPT sequence is asymptotically optimal. Extensive computational experiments suggest that the SPT heuristic may be a good choice for just-in-time production.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.