Abstract

We analyze the electricity transmission planning process in Germany (Netzentwicklungsplan), which separates transmission expansion decisions from generation dispatch. We employ an economic modeling approach to analyze two different network planning settings. In the first setting, there is no trade-off between transmission network development and generation dispatch, as is currently the case in Germany. A second setting alternatively allows for such a trade-off, and thus represents a welfare superior way of transmission network planning. Applications with the two model variants are carried out for the German electricity system in 2035. The results illustrate overinvestment in transmission capacity and decreased welfare associated with the Netzentwicklungsplan.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.