Abstract
This paper develops a method for planning smart grid functions for residential loads. The proposed planning method is developed based on defining an equivalent battery storage unit (BSU) at the distribution transformer, which feeds residential loads to be operated by smart grid functions. The power ratings of the equivalent BSU are set to match the power ratings of all controllable appliances (water heaters, air conditioners, and heating units) in the residential loads to be operated by smart grid functions. Moreover, the charge and discharge durations of the equivalent BSU are set as the off-peak-demand and peak-demand times, respectively. The equivalent battery-based planning method is tested for residential loads fed by 5 different distribution transformers. These residential loads are set to be operated by smart grid functions. Test results demonstrate the ability of the proposed method to be used for planning accurate, effective, and stable actions of smart grid functions, with minor sensitivity to the levels of power demands and/or type of controlled appliances.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.