Abstract
The modern shipboard power system integrates heavy loads and has less fault tolerance than the conventional power system. Therefore, a fast and high-performance reconfiguration scheme is needed when a fault occurs. In this paper, a two-step reconfiguration method is proposed to achieve a rapid and optimal reconfiguration scheme for shipboard power system. This method at first employs graph theory to generate an emergency reconfiguration which can quickly restore the system with relaxed operation constraints. Then, the particle swarm optimization (PSO) algorithm is used to improve the reconfiguration scheme while considering multiple objectives and stringent constraints.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.