Abstract

Due to the new carbon neutral policies, many district heating operators start operating their combined heat and power (CHP) plants using different types of biomass instead of fossil fuel. The contracts with the biomass suppliers are negotiated months in advance and involve many uncertainties from the energy producer's side. The demand for biomass is uncertain at that time, and heat demand and electricity prices vary drastically during the planning period. Furthermore, the optimal operation of combined heat and power plants has to consider the existing synergies between the power and heating systems. We propose a solution method using stochastic optimization to support the biomass supply planning for combined heat and power plants. Our two-phase approach determines mid-term decisions about biomass supply contracts as well as short-term decisions regarding the optimal production of the producer to ensure profitability and feasibility. We present results based on two realistic test cases.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.