Abstract

Problems with “blocking” (limited intermediate storage space) are used frequently for modelling and scheduling just-in-time and flexible manufacturing systems. In this paper, an approximation algorithm is presented for the problem of finding the minimum makespan in a two-machine permutation flow-shop scheduling problem with the mediating buffer of finite capacity. The algorithm is based on the tabu search approach supported by the reduced neighborhood, search accelerator and technique of back jumps on the search trajectory. Due to some special properties, the proposed algorithm provides makespans very close to optimal in a short time. It has been shown that this algorithm outperforms all known approximation algorithms for the problem stated.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.