Abstract

Hot rolling scheduling is a difficult problem in the steel processing industry. It involves many objectives and constraints in both technical and practical respects. A two-stage scheduling method is proposed in this paper. Batch planning of staple material is formulated as a VRPTW, which is solved with a modified PGA. Then, batches of the established units are optimized by adjusting rolling sequences using intelligent search algorithms to reach higher hot charge ratios. This method has been applied to a hot strip mill belonging to Baosteel in China. Our results demonstrate that the proposed technique can improve production efficiency and offer significant economic benefits.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.