Abstract

Motivated by applications in iron and steel industry, we consider a two-stage flow shop scheduling problem where the first machine is a batching machine subject to the blocking constraint and the second machine is a discrete machine with shared setup times. We show that the problem is strongly NP-hard when the objective is to minimize the makespan. When solved with a heuristic priority rule, the worst case ratio with the minimum makespan is 2. For a more general objective, the minimization of a linear combination of the makespan and the total blocking time, a quadratic mixed integer program is presented first. Then we pinpoint two cases with polynomial time algorithms: the case without blocking constraint and the case with a given job sequence. Also for the general objective, we analyze an approximation algorithm. Finally, we evaluate the algorithms, giving experimental results on randomly generated test problems.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call